Miniature circuit breakers and residual current devices on a DIN rail

Industrial MRO: plant and facility supplies.

Maintenance, repair and operations supplies for industrial plants and facilities: protection devices, pipe, valves and fittings, safety equipment and consumables, against a line list or a recurring schedule.

Low-voltage switchgear panel with indicator lamps and isolator

The maintenance list.

The consumables and spares an industrial plant or facility runs through on a maintenance schedule: electrical apparatus and protection devices, pipe, valves and fittings, plumbing and heating, and safety equipment and PPE.

Supplied manufacturer-direct where we can, through an authorised channel where we must, against your own line numbering. This sits under Industrial Procurement.

Plant and facility MRO

Protection devices, pipe, valves and fittings, plumbing and heating, and safety equipment and PPE, consumed on a maintenance schedule.

Manufacturer-direct or equivalent

Manufacturer-direct where we can serve your timeline, a technical equivalent against the same standard where we cannot.

Recurring or one-off

Priced as a standing maintenance schedule, or a single line list, against your own numbering either way.

How it runs

Four steps, whether it is a one-off line list or a recurring maintenance schedule.

You send

The maintenance schedule or line list, and how often it repeats

We acknowledge

Within two business days, with the date for the priced schedule confirmed

We price

Manufacturer-direct or a marked technical equivalent, line by line

You reorder

Against the same schedule, or a revised one, without requoting from scratch

What we need

The line list or maintenance schedule, the destination, and how often the order repeats. All three change what we put against a line.

Where it goes

From Dubai into the GCC, Iraq and the Levant, North Africa, West Africa and South Asia. Conformity certificates and test reports are prepared for the destination market, and freight, customs clearance and last-mile delivery stay in our hands.

Minimum order value USD 3,000.

Coiled cable stock racked in a supply warehouse
Coiled cable stock racked in a supply warehouse
Low-voltage switchgear panel with indicator lamps and isolator
Low-voltage switchgear panel with indicator lamps and isolator

Questions we are asked

Is this aviation MRO?

No. This is industrial plant and facility MRO: protection devices, pipe, valves and fittings, plumbing and heating, and safety equipment and PPE.

Can you supply against a recurring maintenance schedule?

Yes. Once a schedule is agreed, reordering runs against it.

What happens to lines you cannot match exactly?

They come back marked, with a technical equivalent against the same standard and its datasheet. Nothing is silently substituted.

Do you supply safety equipment and PPE alongside parts?

Yes, on the same schedule and the same line numbering as the rest of the maintenance list.

What does it cost to have a schedule priced?

Nothing. Pricing a schedule or line list is free.

Send the line list or maintenance schedule, and how often it repeats.

Send an enquiry

Also on the site

© 2026 Xpitrade General Trading LLCPrivacy  ·  Compliance  ·  Back to top ↑