Cover of Water Supply Controls Drawing Set

Components & Specification · Drawing set

Water Supply Controls Drawing Set

Thirteen reference plates at full sheet size, issued with the Water Supply Controls booklet. Each carries a strip saying what it shows, the figures that govern it, and the booklet section it belongs to.

Reference
EPIC-WSC-DS
Edition
3 · September 2026
Format
PDF · 15 pages · 5.7 MB
Access
On request
Request a copy Sent by the team on request

About this document

The drawing set is the illustrated companion to the EPIC Water Supply Controls booklet. Its thirteen plates show the control schemes, process diagrams and wiring arrangements the booklet describes, each at full sheet size with a strip beneath it keyed to the relevant booklet section.

The plates follow the booklet's four control architectures. The pump-less mains-pressure scheme is shown as a system schematic, a three-dimensional view and a section through the EPIC module. Pumped recirculation has a three-dimensional view and a process schematic with programmable control. The creek and sump return scheme has a three-dimensional view and an instrumented P&ID, and the off-grid solar scheme a three-dimensional view and a full DC schematic.

The last four plates cover wiring where two areas are controlled: simultaneous power from one timer, drawn as an isometric view, a ladder diagram and a variant of it for checking the common routing, and independent timers, each with its own transformer, for two areas on separate programmes.

The index states that the sheets are drawing-office records, not contract documents, and that where a plate and the booklet differ, the booklet governs. On site, the plate for the architecture being built is printed, marked with the flow-control settings at commissioning, and filed with the commissioning record.

What is inside

  1. A1 to A3
    Pump-less, mains pressureSystem schematic, three-dimensional view, and a section through the EPIC module.
  2. A4 and A5
    Pumped recirculationThree-dimensional view and a process schematic with programmable control.
  3. A6 and A7
    Creek feature and sump returnThree-dimensional view and the instrumented P&ID with pump, flow and alarm logic.
  4. A8 and A9
    Solar, off gridThree-dimensional view and the full DC scheme with recirculation.
  5. A10 to A12
    Simultaneous power wiringOne timer starting two areas: isometric view, ladder diagram, and a variant for checking the common routing.
  6. A13
    Independent timers wiringTwo timers and two transformers, each area on its own programme.

Working on a project? Send us the drawings, the bill of quantities or the question.

Talk to us

Published by EPIC Total Water Solutions LLC, Reno, Nevada. Issued in the Middle East and North Africa by Xpitrade General Trading LLC.