Cover of Standards and Compliance

Performance & Compliance · Register

Standards and Compliance

The register of codes, standards, authority acceptances and reuse regulations that govern an EPIC installation, and where the evidence for each one sits.

Reference
EPIC-SC-01
Edition
1 · September 2026
Format
PDF · 9 pages · 0.4 MB
Access
On request
Request a copy Sent by the team on request

About this document

EPIC-SC-01 lists every normative document that bears on an EPIC installation, states EPIC's standing against it and names the evidence held for it. It is written as the first document to hand a specifier, an authority reviewer or a pre-qualification desk on an EPIC scheme.

Each entry carries one of four kinds of standing: Accepted, Tested, Designed to or Context. Part A covers authority acceptances and intellectual property: City of Los Angeles Standard Plan S-496-1, TCF Bank Stadium at the University of Minnesota (LEED for New Construction Silver, 2009), Saudi Aramco SAES-S-030, Abu Dhabi Municipality Irrigation System Design Manual WA-725-1, and US Patents 5,921,711, 7,517,172 B2 and 10,472,813 B1.

Part B names the laboratory load test reports (Construction Materials Engineers Inc., 2018, and American Engineering Testing, 2009), the durability sources behind the service-life position, and the standards an installation is designed and specified to: ASTM D2412, AASHTO H-20, HS-25 and LRFD HL-93, ASTM D2321, ASTM D3350, ASTM C136, ASTM D2434, ASTM D7465 and AASHTO M288. It closes with wording for a project specification.

Part C covers Gulf reuse and irrigation regulation: UAE Federal Cabinet Resolution No. (39) of 2021, the Abu Dhabi Department of Energy Recycled Water and Biosolids Regulations and Water Quality Regulation, Dubai's Al Sa'fat Regulation 601.04, Local Order 61 of 1991 and Technical Guideline 13, the Saudi Executive Regulations of the Law of Treated Sewage Water and its Reuse, GSO 3000:2025 and the on-site wastewater sizing tables. Part D covers LEED, Estidama, Al Sa'fat, Mostadam and GSAS, and Part E lists the evidence file.

4Kinds of standing: Accepted, Tested, Designed to and Context
5Parts, A to E
3US patents of record
2Independent laboratory load test reports

What is inside

  1. Intro
    How to read this registerThe four kinds of standing and the three rules the register keeps.
  2. Part A
    Authority acceptancesPublic bodies that have taken EPIC into their own documents, and the patents of record.
  3. Part B
    Structural, material and installation standardsLoad testing, durability sources, the standards EPIC is designed to, and specification wording.
  4. Part C
    Water reuse and irrigation regulationUAE federal, Abu Dhabi, Dubai, Saudi Arabia, Qatar and the wider GCC, and on-site wastewater sizing.
  5. Part D
    Green building rating systemsLEED, Estidama, Al Sa'fat, Mostadam and GSAS, and how a contribution must be stated.
  6. Part E
    The evidence fileEvery document named in the register, where it is held and how to request it.

Working on a project? Send us the drawings, the bill of quantities or the question.

Talk to us

Published by EPIC Total Water Solutions LLC, Reno, Nevada. Issued in the Middle East and North Africa by Xpitrade General Trading LLC.

© 2026 Xpitrade General Trading LLCPrivacy  ·  Compliance  ·  Back to top ↑