Cover of Case Study Compendium

Evidence & Track Record · Case study compendium

Case Study Compendium

Thirteen EPIC project case studies in one volume: greenhouses, open fields, island plots, parks, a school, two stadiums and a roof, in the United States, the UAE and Saudi Arabia.

Edition
2 · September 2026
Format
PDF · 59 pages · 18.6 MB
Access
Open
Download PDF Arabic PDF Free · no form · English and Arabic

About this document

The compendium binds the thirteen EPIC project case studies, CS-01 to CS-13, into a single volume, each on its own sheet of four pages, or five where the record runs to it, with an evidence level printed on every cover and repeated in the contents.

Each sheet follows the same order: headline figures and evidence level on the first page; the site, the problem and what was built on the second; the measured record on the third; and further findings with dated photographs at the end. Six evidence levels are used (measured, measured partial, certified, monitored, designed and built, and documented) so a reader can see what each project can support before opening it.

Seven studies are in the Gulf. At Al Dahra in Al Ain, the half of Greenhouse 5 converted to EPIC used 85% less water and 46% less fertiliser than the drip half, with 102% more cucumber per plant. The set also covers the open-field demonstration at Al Dahra, Al Sammaleah Island, the Yas Island landscape plots and seawater plot, the Royal Commission's Al Fanateer Corniche plot at Jubail, and Al Salamat Park in Al Ain.

Six are in the United States: Westside Park in Los Angeles, Cambria Elementary School on the California coast, Wildwood Commons in Minnesota, the Bookmen Stacks Park Plaza green roof and TCF Bank Stadium in Minneapolis, and Washburne Stadium at Southern Methodist University in Dallas, photographed in play in 2026, twenty years after installation.

13Project case studies
3Countries: USA, UAE and Saudi Arabia
20Years, the longest photographic record
6Evidence levels, printed on every cover

What is inside

  1. CS-01 to CS-02
    Al Dahra, Al AinGreenhouse 5 metered against drip, and the open-field demonstration.
  2. CS-03
    Al Sammaleah IslandFour plots on four water sources against a metered sprinkler control, 2007.
  3. CS-04 to CS-05
    Yas Island, Abu DhabiFive metered landscape plots for Aldar and the Urban Planning Council, and the seawater plot.
  4. CS-06
    Al Fanateer CornicheA 400 m² plot monitored for the Royal Commission for Jubail & Yanbu.
  5. CS-07
    Al Salamat ParkNineteen weeks of municipal inspection in Al Ain, 2012.
  6. CS-08
    Westside ParkA Los Angeles park designed to irrigate itself from the storm drain beneath it.
  7. CS-09
    Cambria Elementary SchoolA water-independent park and field on the California coast.
  8. CS-10
    Wildwood CommonsWhole-site stormwater on a single BMP, Willernie, Minnesota, 2006.
  9. CS-11
    Bookmen Stacks Park PlazaAn intensive green roof over a parking garage in Minneapolis.
  10. CS-12 to CS-13
    TCF Bank Stadium and Washburne StadiumStadium stormwater inside a LEED Silver certification, and a collegiate field in service since 2006.

Working on a project? Send us the drawings, the bill of quantities or the question.

Talk to us

Published by EPIC Total Water Solutions LLC, Reno, Nevada. Issued in the Middle East and North Africa by Xpitrade General Trading LLC.

© 2026 Xpitrade General Trading LLCPrivacy  ·  Compliance  ·  Back to top ↑