Project case study · CS-01 · Protected agriculture
Greenhouse 5
Al Dahra Agricultural Company · Al Ain, United Arab Emirates. A greenhouse split down the middle: same crop, same house, same climate, drip on one half and EPIC on the other, with a water meter on each.
- Reference
- CS-01
- Edition
- 2 · September 2026
- Format
- PDF · 4 pages · 1.5 MB
- Access
- Open
About this case study
Half of Greenhouse 5 at the Al Dahra farm in Al Ain was converted to EPIC in December 2010. The other half stayed on its existing surface drip system as the control, both halves were metered, and the crop on both was cucumber grown for local markets.
The farm owner and the local municipality wanted to make local food production more efficient and were looking at alternatives to surface drip. About 80% of water in the UAE is used for agriculture. Under drip, fertiliser also tends to seep down and away from the root zone, which costs the farm money and puts groundwater at risk of contamination.
Trenches were dug by hand and lined with Firestone EPDM. Ten rows of plants in five sections each got an independent EPIC chamber, connected to the drain header to make a closed loop, then covered with fine gravel and sweet sand. A reservoir tank with a submersible pump supplies the water, and a 90 degree elbow on the drain header sets the level. Fertiliser is dissolved in the reservoir and carried through the system, while trace elements are applied to the leaves.
On the most recent of the two cucumber crops grown after conversion, the drip half used 370 m³ of water and the EPIC half used 55 m³. Water per kilo of cucumber fell from 40 to 3 US gallons, yield per plant rose from 3.57 to 7.22 kg, and fertiliser use fell from 92 to 50 kg. For the 2011 crop, the daily meter log from 17 April to 3 July records 67.2 m³ on EPIC against 403.2 m³ on drip, a saving of 83%.
Project record
- Client
- Al Dahra Agricultural Company
- Location
- Al Ain, United Arab Emirates
- Installed
- Systems in two greenhouses at the farm, one completed December 2010, the other March 2011
- Crop
- Cucumber, grown for local markets
- Configuration
- Half of Greenhouse 5 converted to EPIC, half left on the existing drip system as the control. 10 rows of plants (2 rows across 5 sections), each section with its own independent EPIC chamber; trenches excavated by hand
- Water metering
- Both halves metered separately
- Fertiliser method
- Fertigation: fertiliser dissolved in the EPIC reservoir and carried by the water through the system; trace elements applied foliar
- Most recent crop: water consumed
- Drip 370 m³ · EPIC 55 m³ · 85% less
- Most recent crop: water per kilo of cucumber
- Drip 40 US gal · EPIC 3 US gal · 92.5% less
- Most recent crop: cucumber per plant
- Drip 3.57 kg · EPIC 7.22 kg · 102% more
- Most recent crop: fertiliser used
- Drip 92 kg · EPIC 50 kg · 46% less
- 2011 crop: meters, 17 April to 3 July 2011
- EPIC 50.1 to 117.3 m³, 67.2 m³ consumed · Drip 249.6 to 652.8 m³, 403.2 m³ consumed · 83% saving
- 2011 crop: fertiliser, weeks 2 to 11
- EPIC 50.50 kg · Drip 116.25 kg · 57% saving
- Production, 3 July 2011
- EPIC 414 plants at 0.373 boxes per plant · Drip 679 plants at 0.244 boxes per plant · a box is 16 kg
Working on a project? Send us the drawings, the bill of quantities or the question.
Talk to usPublished by EPIC Total Water Solutions LLC, Reno, Nevada. Issued in the Middle East and North Africa by Xpitrade General Trading LLC.