Cover of Wildwood Commons

Project case study · CS-10 · Land development · Stormwater BMP

Wildwood Commons

WhiteHorse Development Corporation · City of Willernie, Minnesota, USA · 2006. The first project in the seven-county Minnesota metro to rely on a single BMP for all of a site's stormwater, on a contaminated infill lot beside a wetland.

Reference
CS-10
Edition
2 · September 2026
Format
PDF · 4 pages · 0.4 MB
Access
Open
Download PDF Arabic PDF Free · no form · English and Arabic

About this case study

Two townhome buildings with nine units in all, on a 30,000 sq ft infill lot in Willernie, Minnesota. They were built in 2006 with EPIC in every green area as the site's only stormwater management system, collecting, treating and storing the runoff from the whole development.

The lot was once a gas station and an engine repair shop. It sits on the boundary between two cities, in a watershed that drains toward White Bear Lake, and a large wetland wraps around its north-east corner. Opposition focused on stormwater and the wetland, including concern that infiltration would carry pollutants into the water. Contamination was found during the works and cleaned up by TetraTech, Inc. with the MPCA. The site was below the Rice Creek Watershed District's one-acre permit threshold, but the developer met the standard anyway.

Stormwater from the roofs, roads and rear driveways is filtered and treated through the sand and reused for irrigation. Any excess drains through 4-inch PVC storm lines to an existing street catch basin. Irrigation works by gravity, with no pumps and nothing to prepare for winter or summer. At its normal water level the system holds up to three weeks of irrigation water. On this site the EPDM liner deliberately prevents infiltration, sealing the cleaned-up soil so contaminants cannot leach toward the wetland or groundwater.

Site performance was published as a modelled baseline compared with the system's actual outflow. From 16 June to 24 September 2007, with 13.55 in of rain, modelled runoff was 32,181 cubic feet and actual outflow was 14,172, a 56% reduction. For total phosphorus from 11 August to 20 September, the paper gives a modelled load of 0.2 lbs and an outflow of 0.019 lbs, and states an 85% reduction.

56%Site runoff reduction, 16 June to 24 September 2007
85%Phosphorus load reduction stated, 11 August to 20 September
FirstSingle-BMP site in the seven-county Minnesota metro
3 weeksIrrigation water held at the normal water level

Project record

Developer
WhiteHorse Development Corporation; Mr Tim Jawor, President
Location
McGregor Avenue × Stillwater Road (Wildwood / CSAH 12), City of Willernie, Minnesota
Constructed
2006
Development
Two townhome buildings, nine units total
Site
30,000 sq ft former gas station and engine repair lot; site plan: ¾ acre, 80% impervious, adjacent wetlands
Prior use
A gas station and an engine repair shop
Jurisdictions
City of Willernie, Willernie City Engineer Mr Les Mateffy, Rice Creek Watershed District, Washington County, MPCA
Receiving water
Drains toward White Bear Lake, Minnesota
Engineering
RESI engineered the project and managed the approval process
Site runoff, 16 June to 24 September 2007
Precipitation 13.55 in · potential runoff 32,181 cu ft · EPIC actual outflow 14,172 cu ft · 56% reduction
Total phosphorus, 11 August to 20 September
Potential load 0.2 lbs · EPIC outflow 0.019 lbs · 85% total reduction, as given in the engineer's paper

Working on a project? Send us the drawings, the bill of quantities or the question.

Talk to us

Published by EPIC Total Water Solutions LLC, Reno, Nevada. Issued in the Middle East and North Africa by Xpitrade General Trading LLC.

© 2026 Xpitrade General Trading LLCPrivacy  ·  Compliance  ·  Back to top ↑