Project case study · CS-06 · Municipal landscape · Saline remediation

Al Fanateer Corniche

Royal Commission for Jubail & Yanbu · Jubail Industrial City, Saudi Arabia. A 400 m² plot that the client monitored against a 50% saving target. The sand it was built with was too salty for turf, so the system flushed itself.

Reference
CS-06
Edition
2 · September 2026
Format
PDF · 4 pages · 0.7 MB
Access
Open
Download PDF Arabic PDF Free · no form · English and Arabic

About this case study

A 400 m² turf plot irrigated with treated sewage effluent at Al Fanateer Corniche, Jubail Industrial City. It was installed in December 2011 as a pilot for the Royal Commission for Jubail & Yanbu and monitored by the Commission's contractor SATCO together with EPIC staff on site.

In October 2011 Sheikh Faisal Al Rasheed, the Commission's Director of Planning, invited EPIC to run the pilot, with a target of a 50% water saving against existing systems. The site was against it from the start. The sand was very salty and unwashed, the turf supplied was of poor quality, and planting fell in the grass hibernating season. A high water table near the sea also pushes seawater into conventionally landscaped ground, but it cannot enter an EPIC profile.

On 28 December, eleven days after turfing, soil salinity read 0.91 at about 25 cm deep, against the 0.1 to 0.4 recommended for turf. The cause was unwashed sand and too much fertiliser. The system flushed itself: the water level was raised until fresh water flooded most of the profile, then drained, taking the salt with it, with no modification or special equipment. Flushing ran on 29 and 31 December and 3 January, and on 4 January 2012 salinity read below 0.4.

The client's daily meter log shows 102 m³ added over 105 days on the 400 m² plot. Take out the 16 m³ removed for flushing and use comes to 2.05 L/m²/day. Also take out the 38 m³ used to charge the profile and it comes to 1.14 L/m²/day. The existing pop-up sprinklers at Al Fanateer use 20 L/m²/day, and the report states a saving of more than 80%. By 21 February 2012, roots had reached at least 20 cm.

2.05L/m²/day over 105 days, against 20 on site
>80%Saving stated in the report, against the client's 50% target
0.91 to <0.4Soil salinity, 28 December 2011 to 4 January 2012, flushed by the system itself
400 m²Turf plot on TSE

Project record

Client
Royal Commission for Jubail & Yanbu (RCJY)
Location
Community Area, Danah Road × Danah 3, Jubail Industrial City, Saudi Arabia
Monitoring
Eng. Faisal Al Khatib, SATCO, main coordinator on behalf of the Royal Commission, with two Epic Green Solutions team members stationed in the Eastern Province
Contract
SATCO Contract No. 951-S24
Area
400 m², planting type turf (carpet grass)
Commencement / completion
10 to 17 December 2011; turf installed 17 December 2011
Water source
TSE
Initial charge
19 m³ from lorry tanker plus 19 m³ from the main supply line, to saturate the sand profile
Initial fertiliser
100 kg slow release 15-15-15 plus 10 kg slow release 20-20-20
Target set by the client
50% water saving
Water added
Tanker 22.5 m³ · pump 79.5 m³ · total 102 m³
Removed for flushing
16 m³
Used for charging the profile
38 m³
Water attributable to the plot, 105 days, 400 m²
Less flushing: 86 m³, 2.05 L/m²/day · less flushing and charging: 48 m³, 1.14 L/m²/day
Existing pop-up sprinklers at Al Fanateer
20 L/m²/day
Salinity, 28 December 2011
0.91 at about 25 cm depth; 7 m³ added for soil leaching
Flushing
29 December, 31 December (a further 9 m³ added) and 3 January
Salinity, 4 January 2012
Below 0.4, accepted as the optimum level for turf
Rooting, 21 February 2012
Roots to at least 20 cm; good progress on greening and rooting
Soil activity at 10, 15 and 25 cm
EPIC 0.22 / 0.33 / 0.65 · normal sprinkler system 0.04 / 0.07 / 0.06

Working on a project? Send us the drawings, the bill of quantities or the question.

Talk to us

Published by EPIC Total Water Solutions LLC, Reno, Nevada. Issued in the Middle East and North Africa by Xpitrade General Trading LLC.

© 2026 Xpitrade General Trading LLCPrivacy  ·  Compliance  ·  Back to top ↑